i require 8 x 600 kw wind turbines and would like a quote based on the following:
1) Dismantaling of existing turbine and loading
2) Transport to
3) Ship Time and Lead times to South Africa
4) Installation of Wind Turbines
Date | Manufacturer | Model | Quantity | Budget | Country |
---|---|---|---|---|---|
13/07/2020 | Nordex | N43/600 | 1 | Moldawien | |
26/09/2019 | Nordex | N43/600 | 1 | Kolumbien | |
20/04/2018 | Nordex | N43/600 | 1 | Polen | |
23/06/2015 | Nordex | N43/600 | 1 | Bulgarien | |
25/04/2015 | Nordex | N43/600 | 1 | ||
23/09/2014 | Nordex | N43/600 | 1 | Deutschland | |
05/02/2014 | Nordex | N43/600 | 1 | Deutschland | |
11/01/2013 | Nordex | N43/600 | 1 | Polen |