Reviewed and commented by wind-turbine.com
Dismantling of the entire plantMain components: rotor blades, hub, generator, machine carrier are to be dismantled by crane for later useHub, generator, machine carrier and control cabinets, converter and other electrical equipment are to be loaded and transported approx. 120km to St. Pölten, where they are unloaded and stored. Removal of the electrical components are loaded in the base of the tower and transported approx. 120km to St. Pölten, where they are unloaded and stored. Dispose of the concrete tower and its interior fittings (ladder, lift)Dispose of the steel tower and its interior fittings (ladder, lift)Store the wings on site on racks for ev. Further use