Description

A RePower MD77 1.5MW NH 100m commissioning 2006 is offered as part of a repowering project. The site is located in the district of Uelzen. The system is SDL capable.

Takeover and details on price, decommissioning, etc. after contact.


Initial data of the plant:

Manufacturer/Type: Repower MD77
Control: WP 3000
Rated power: 1.5MW
IBN: 10/24/2006
Nab height: 100.0m
Rotor diameter: 77.0m
Tower type: Steel tube tower
Tower manufacturer: SIAG
Gearbox: Winergy
Generator: VEM
Inverter: Alstom
Rotor blades: LM 37.3P DK
Driving system: Avanti
last dates:
Annual maintenance: 03/2020
Half-year maintenance: 09/2019
Inverter maintenance: 12/2019
Expert examination: 08/2020
DGUV V3: 05/2020
ZÜS driving system: 12/2019
WKP: 05/2020
Rotor blade report: 05/2020
Trafo maintenance: 09/2020