Wind projects under pressure: TAVOA draws attention to outdated valuation assumptions. Tilo Reimann, Managing Director of TAVOA GmbH, identifies ...
WindEurope is just around the corner and we can't wait to meet you there! Our experts Fabio Monachesi, Hergen Bolte and Miguel Roenes will be on hand to share the latest findings in wind testing, inspection and certification (TIC).
The issues of the condition and service life of wind turbines are becoming increasingly important. We are happy to exchange ideas about:
• Periodic inspections within the design lifetime (WKP)
• Periodic inspections as part of continued operation (WWKP)
• Condition-based tests (ZOP)
• End of Warranty (EOW) inspections
• LTE DIBT report for continued operation – "Evaluation and testing for continued operation" (BPW)
• LTE certification
Meet us at booth D-D10, April 8-10, at the Bella Center in Copenhagen, Denmark.
Arrange a meeting with us: https://s.ul.com/4iDlMpv
Wind projects under pressure: TAVOA draws attention to outdated valuation assumptions. Tilo Reimann, Managing Director of TAVOA GmbH, identifies ...
The NIS2 Regulation raises the issue of information security in the wind energy industry to a new level. Operators and operators should now check ...
Wind turbines need aviation obstacle lights so pilots can spot tall structures at night. The issue on the ground is simple. The lights blink for ...
The UK Civil Aviation Authority (CAA) has published Edition 7 of CAP 764: CAA Policy and Guidelines on Wind Turbines, formally permitting the use of ...