If we look back a few decades, wind turbines were still installed on comparatively low lattice masts. No wonder – the rated output of the first ...
Husum / Morocco,
16 September 2025 – At the start of HUSUM WIND 2025, the
international marketplace wind-turbine.com a new asset class for
institutional investors and project developers: "Ready to Build" projects.
The starting signal is given by a large-scale project from Morocco that is ready for construction, which is now available via
the platform is offered.
If we look back a few decades, wind turbines were still installed on comparatively low lattice masts. No wonder – the rated output of the first ...
The other day, on the way back from an excellent event on digitalisation in the wind industry in Osnabrück, my train was – of course – delayed. So I ...
In the wind energy industry, wind turbines and components permanently exposed to high loads – from mechanical wear to saline Air, humidity and ...
Let's imagine the following scenario: An investor acquires a wind farm. In joyful hopefully, the wind farm will be taken over and operated. But ...