Onshore wind project right with 6.8 MW in Mecklenburg-Western Pomerania

Near-approval onshore wind project law for a single turbine in a legally binding wind priority area. Ideal for investors with a focus on low-risk entry just before approval.

  • Planned power: 6,8 MW
  • Plant configuration: 1 Onshore wind turbine, manufacturer flexible
  • Projected annual return: up to approx. 22.4 GWh p.a.
  • Location: Mecklenburg-Western Pomerania (wind priority area)
Project close to approval
with a clear timeline
Legally binding
Wind priority area
Above-average
Earnings perspective
Asset Deal
for investors

Description of the wind project

Onshore wind project law in Mecklenburg-Western Pomerania – entry shortly before approval

An onshore wind project right close to approval is offered for a single turbine with 6.8 MW in a legally binding wind priority area in Mecklenburg-Western Pomerania.

The site is characterized by above-average wind conditions, an exposed location in the main wind direction and a high yield expectation. Environmental assessments and mapping have been completed, and there are no restrictions relevant to approval.

The permit application according to § 6 WindBG was submitted in Q2 2025, the approval is expected for Q2 2026. The sale will take place in an asset deal.
Interested in more project information?

Key Facts

  • Land
    Germany, Mecklenburg-Western Pomerania
  • Project type
    Onshore wind project law
  • Planned power
    6,8 MW
  • Wind conditions
    Ø up to approx. 7.8 m/s, exposed peak location
  • Plant parameters
    Hub height up to 199 m, manufacturer open
  • Annual energy yield
    bis ca. 22,4 GWh p.a.
  • Environmental status
    Expert reports and mapping completed, no restrictions
  • Area status
    Long-term, economically attractive leases secured
  • Grid status
    Positive grid pre-enquiry, grid commitment in preparation
  • Project status
    Application for approval § 6 WindBG submitted (Q2 2025)