wind-turbine.com
Search
wind-turbineMatch
With us you will find the right provider!
Create an inquiry and we will put you in touch with relevant providers.
Budding

Large-scale onshore wind project rights with 105-294 MW

Large-scale onshore wind project in Mecklenburg-Western Pomerania with partial takeover option, very good wind conditions and approval prospects from 2027.

  • Total power: approx. 105-294 MW
  • Entry-level model: Partial takeover of 25-50% of the sites
  • Attachments: initially 15 onshore wind turbines
  • Location: Mecklenburg-Western Pomerania
Large scale
Wind site
Flexible
Partial takeover
Long-term
Lease agreements
secured
Asset Deal
for investors
& Operators

Description of the wind project

Onshore wind project right in Mecklenburg-Western Pomerania - 105-294 MW

It offers a large-scale onshore wind project right in Mecklenburg-Western Pomerania with a planned total capacity of around 105 to 294 MW. The project enables a flexible entry through the acquisition of 25 to 50 percent of the planned sites and is aimed in particular at institutional investors, strategic partners and operators with a focus on scalable wind portfolios.

The site is characterized by very good wind conditions of around 7.6 m/s at a hub height of 180 m, economically viable lease agreements and a high development potential due to possible area expansions.

The application for a preliminary decision pursuant to Section 9 (1a) of the Federal Immission Control Act will be submitted in the fourth quarter of 2025, and approval is expected in the first quarter of 2027. Environmental mapping is ongoing or already available; all planned wind turbines are located outside relevant nest zones.

The sale will take place in an asset deal and offers a reliable basis for a pro rata or structured entry into a large-scale wind site close to approval.
Interested in detailed project documents?

Key Facts

  • Land
    Germany, Mecklenburg-Western Pomerania
  • Project type
    Onshore wind project law (large site)
  • Planned power
    approx. 105-294 MW
  • Wind conditions
    Ø approx. 7.6 m/s at 180 m hub height
  • Asset portfolio
    initially 15 onshore wind turbines
  • Annual energy yield
    approx. 20 GWh per wind turbine
  • Environmental status
    Environmental mapping ongoing or available; All wind turbines outside relevant nest zones
  • Areas & Rights
    Long-term, economically sound leases with no minimum rent
  • Mains connection
    Positive grid connection preliminary request for up to 100 MW
  • Project status
    Preliminary decision pursuant to Section 9 (1a) of the Federal Immission Control Act applied for (Q4 2025), approval expected Q1 2027

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com