wind-turbine.com
In development

Attractive wind project rights in Brandenburg for up to 3 wind turbines and 21.6 MW

Attractive onshore project with secure locations and preliminary decision according to § 9 para. 1a BImSchG.

  • Total potential: 21,6 MW (3x WEA RD ≥ 170 m)
  • Current planning: 2 wind turbines (7.2 MW & 6.0 MW), NH up to 175 m
  • Wind speed: up to 7.44 m/s (at 180m NH)
Good wind quality
at hub height
BImSchG
Preliminary decision available
No known
Environmental obstacles
Attractive
Lease conditions

Description of the wind project

Onshore wind project law in Brandenburg

The offer includes a wind project right in Brandenburg with a total potential of 21.6 MW (3 wind turbines). Currently, two sites with a combined capacity of 13.2 MW are secured under planning law by a preliminary decision in accordance with Section 9 (1a) of the Federal Immission Control Act.

The wind conditions can be classified as very good with a speed of up to 7.44 m/s (at 180 m NH). The securing of land is already well advanced with over 49 ha.

The corresponding offers were obtained for the compilation of the application documents for a full licensing procedure in accordance with the Federal Immission Control Act. Access is possible via the existing country road. The grid connection can potentially be realized via the nearby substation or a 110 kV overhead line.

The lease conditions are yield-dependent (between 7.0% and 10.0%) with an attractive minimum lease structure.
Interested in more project information?

Key Facts

  • Location
    Brandenburg, Germany
  • Project type
    Onshore wind project law
  • Planned plants
    2 wind turbines (7.2 MW & 6.0 MW)
  • Potential performance
    21,6 MW (3 WEA)
  • Wind conditions
    6.00 m/s (100m) to 7.44 m/s (180m)
  • Area status
    49.20 ha contractually secured
  • Environmental status
    No insurmountable effects evident at present
  • Mains connection
    Nearby 110kV substation or 110 kV overhead line
  • Cataloguing
    Existing access road via country road available
  • Project status
    Preliminary decision according to § 9 para. 1a BImSchG available for two wind turbines

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com