wind-turbine.com
In development

Attractive wind project rights in Brandenburg for 3 wind turbines and 19.2 MW

Advanced onshore wind project with secured locations, preliminary decision according to § 9 para. 1a BImSchG and possible development potential.

  • Assured level of development: 3 wind turbines with 19.2 MW
  • Wind Potential: up to 7.76 m/s at 180 m hub height
Very good
Wind conditions
Preliminary decision for 3 wind turbines
already available
19.2 MW of secured
State of development
Secured areas
available

Description

Onshore wind project law with a secure level of development

An advanced onshore wind project right in Brandenburg is up for grabs. The project combines an already secured state of development with additional scaling potential and is aimed at investors and developers who are focusing on substantial expansion in the onshore segment.

The current state of development comprises three secured sites with a total capacity of 19.2 MW. A preliminary decision pursuant to Section 9 (1a) of the Federal Immission Control Act has already been issued for these locations. In addition, the project offers an attractive perspective for gradual further development.

The location convinces with very good wind conditions with 6.4 m/s at 100 m, 7.14 m/s at 140 m and up to 7.76 m/s at 180 m hub height. The land protection already includes eight contractually secured areas with a total of 26.68 ha.

The infrastructural framework conditions are also solid: access is via existing access roads via federal or state roads. The grid connection can be realized by expanding an existing 110 kV substation.

The clearly structured economic framework conditions are particularly relevant for investors: the lease is based on earnings and is between 7.0% and 10.0%. In addition, an annual minimum rent is provided for each wind turbine.
Request the project documents now.

Key Facts

  • Location
    Brandenburg, Germany
  • Asset
    Onshore wind project law
  • Secured locations
    3 wind turbines with 19.2 MW
  • Expansion potential
    Expansion potential available
  • Wind Efficiency
    6.4 m/s (100 m), 7.14 m/s (140 m), 7.76 m/s (180 m)
  • Securing land
    8 contractually secured areas with 26.68 ha
  • Approval Status
    Preliminary decision according to § 9 para. 1a BImSchG available for three wind turbines
  • Mains connection
    Connection possible via expansion of an existing 110 kV substation
  • Cataloguing
    Existing access road via federal and country roads
  • Lease model
    Yield-dependent at 7.0 % to 10.0 % and minimum lease per wind turbine

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com