Suzlon S64/1250

  • Annual yield
    1000000 kWh

  • Tower height
    74.5 m

  • Year
    2010

  • Condition
    used

Contact the provider now

Description

the generation data provided is an average generation data per year. The turbine is installed at rajasthan site in the year 2011
available: before march 2015

Supply and demand