NEW New asset class opened: "Ready to Build" — First-hand information in Husum from 16-19 September!
wind-turbine.com
Search
wind-turbineMatch
With us you will find the right provider!
Create an inquiry and we will put you in touch with relevant providers.
Ready to Build (RTB)

Wind farm project 112 MW in Morocco

An attractive, ready-to-build wind energy project with high development potential is for sale in a share deal.

  • Planned power: 112,5 MW
  • Planned turbines: 15 × Goldwind GWH182-7.5MW
  • Annual production (P50, net): ca. 400 GWh
  • Location: Morocco (Atlantic Coast)
Project ready for construction
for immediate start of construction
Excellent
Site conditions
Flexible usage options
Long-term stability
and security

Description of the wind farm project

Ready-to-build wind project on Morocco's Atlantic coast – ideal for grid feed-in or off-grid solutions.

This highly attractive wind energy project with a capacity of 112.5 MW (15 x 7.5 MW) is located in a windy coastal region of Morocco. The site conditions are excellent – with an average wind speed of 8.0 m/s.

The project is fully approved and ready for immediate construction to start. It offers flexible application options: from classic grid feed-in to innovative, off-grid applications such as green hydrogen, industrial supply or seawater desalination through renewable energies.
Interest? Then please feel free to contact us!

Key Facts

  • Land
    Morocco – politically stable, progressive energy law, nearshore wind zone
  • Project type
    Onshore wind power
  • Planned power
    112,5 MW
  • Wind conditions
    Ø 8.0 m/s – wind class II (excellent energy yield)
  • Planned turbines
    15 × Goldwind GWH182-7.5MW (7,5 MW je Turbine)
  • Annual production (P50, net)
    ca. 400 GWh
  • Area status
    Long-term leases (public & private)
  • Grid connection
    Technically and legally secured (225 kV; approx. 40 km distance)
  • Self-sufficient use possible
    Ideal for offshore hydrogen production or desalination plants
  • Sales model
    Share Deal – Takeover of the project company in 2025

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com