wind-turbine.com
In development

Wind energy project in Brandenburg with existing permit basis and expansion to up to 43.2 MW

For sale is a developed onshore wind project in Brandenburg with secured access to land, existing planning progress and preliminary approval in accordance with Section 9 (1a) of the Federal Immission Control Act for two wind turbines.

  • Project potential: up to 6 wind turbines with a total of 43.2 MW
  • Secured project status: 4 potential sites with 28.8 MW
  • Approval base: Preliminary decision according to § 9 para. 1a BImSchG for 2 wind turbines
  • Location quality: Wind speed up to 7.26 m/s at 180 m hub height
43.2 MW
Total potential
Preliminary decision for
2 wind turbines available
4 secured
Locations with 28.8 MW
Advanced
Cataloguing

Description

Onshore wind project law with a secure state of development in Brandenburg

An onshore wind project right in Brandenburg is up for grabs. The project has a project area of 85.38 ha and is at an advanced stage of development.

Currently, 71 areas with a total of 106.08 ha are contractually secured. This results in four contractually secured potential sites with a capacity of 28.8 MW. Two of these locations already have planning rights within the framework of a positive preliminary decision pursuant to §9 para. 1a BImSchG.

The total potential is six wind turbines with 7.2 MW each, or 43.2 MW. The wind potential at the site is 5.98 m/s at 100 m, 6.69 m/s at 140 m and 7.26 m/s at 180 m hub height.

In the area of environmental and species protection, the investigations into avifauna and biotopes have already been completed. Investigations into bats, amphibians and reptiles are currently underway. As things stand, there are no known insurmountable effects.

The development is progressively secured via farm roads as well as federal and district roads. Two substations are being considered for grid connection; reservations are currently being processed.

The economic framework includes a yield-based lease of 5.0% to 11.0% and an annual minimum rent of €30,000 to €97,000 per wind turbine.
Request the project documents now.

Key Facts

  • Location
    Brandenburg, Germany
  • Project type
    Onshore wind project law with further development potential
  • Expansion prospects
    Up to 6 wind turbines with a total of 43.2 MW
  • Secured development framework
    4 potential sites with 28.8 MW
  • Location quality
    Wind speed from 5.98 m/s at 100 m to 7.26 m/s at 180 m hub height
  • Securing land
    71 contractually secured areas with a total of 106.08 ha
  • Approval status
    Preliminary decision according to § 9 para. 1a BImSchG for 2 wind turbines is available
  • Cataloguing
    Access via farm roads as well as federal and district roads secured at an advanced stage
  • Grid connection
    Connection options via two substations; Reservations are in progress
  • Economic structure
    Yield-related lease between 5.0 % and 11.0 % and minimum rent per wind turbine

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com