Approved onshore wind project right with Nordex or Enercon option up to 14 MW in North Rhine-Westphalia

Two approved wind turbine sites:
Buyers are free to choose either to implement 2 x Enercon E-175 EP5 with 7,000 kW each or to have it easily converted to 2x Nordex N175.

  • Planned power: up to 14 MW
  • Approval Status: Final approvals have been obtained
  • Asset Option: Free choice between 2x Enercon E-175 EP5 and 2x Nordex N175
  • Power Supply: up to 21 MW secured with easy access
  • Location: North Rhine-Westphalia
up to 14 MW
Performance
2 approved
Wind turbine locations
21 MW
Grid connection
Free choice
Enercon/Nordex

Description of the wind project

Approved onshore wind project right in North Rhine-Westphalia - with Nordex option up to 14 MW

A highly advanced onshore wind project in North Rhine-Westphalia is being offered. For the two wind turbine sites offered, final BImSchG permits have been obtained.

Buyers thus have a free choice: they can implement the approved Enercon turbines or, if they prefer the Nordex N175, have them easily converted to the Nordex turbine. This has already been agreed with the licensing authority. The expert reports can be adapted to the Nordex variant at short notice in consultation with the experts.

A current plant comparison based on data from a nearby existing plant forecasts a free park yield of 43.8 GWh/a for the Enercon variant and a free park yield of 41.2 GWh/a for the Nordex variant. A grid connection capacity of a total of 21 MW at a substation has been secured for the project.
The plant locations and access roads are secured with moderate leases.

In addition, a possible third turbine site on its own land is still in coordination with the approval authority and offers additional development potential.

Extensive project documents and expert reports are available and can be made available to qualified interested parties in the further process.
Interested in further project information, location details and documents?

Key Facts

  • Land
    Germany, North Rhine-Westphalia
  • Project type
    Onshore Wind Power / Wind Project Law
  • Project status
    Approved Project / RTB Light
  • Approval Status
    2x Enercon E-175 EP5 approved
  • Approved performance
    up to 14 MW
  • Planned plants
    2 wind turbines
  • Facility option
    Approval of 2x Nordex N175 possible.
    Cost of the amendment of the expert opinion approx. 5,000 EUR
  • Predicted parking revenue
    approx. 40.2 GWh/a
  • Grid connection capacity
    21 MW
  • Additional potential
    3. Wind turbine site in coordination with the licensing authority
  • Project documents
    Extensive project documents and expert reports available

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com
↑