Wind project law with approx. 43.2 MW in Mecklenburg-Western Pomerania

Onshore wind project law in a pre-populated location with very good wind conditions, turnover-based lease agreements and approval prospects from 2027.

  • Planned power: ca. 43,2 MW
  • Plant configuration: 6 onshore wind turbines, hub height approx. 166-199 m
  • Projected annual return: approx. 20.1 GWh per wind turbine
  • Location: Mecklenburg-Western Pomerania
Very windy
Location
Low
Approval
Risk
Environmental
non-critical
Location
Asset Deal
for investors
& Operators

Description of the wind project

Onshore wind project rights in Mecklenburg-Western Pomerania - approx. 43.2 MW

An onshore wind project right with a planned total capacity of around 43.2 MW in Mecklenburg-Western Pomerania is being offered. The site is located in a pre-populated location with already approved wind turbines in the vicinity and very good wind conditions of around 7.6 m/s.

An application for a preliminary decision pursuant to Section 9 (1a) of the Federal Immission Control Act was filed in August 2025. Approval is currently expected in the first quarter of 2027. The project is eligible for approval according to § 6 WindBG and § 245e BauGB.

Economically attractive, turnover-based lease agreements without a minimum rent have been concluded. Sound, shadow and stability certificates are already available. Environmental mapping is currently underway, all plants are outside relevant taboo radii; in the case of an investment, a case-by-case assessment is carried out.

The sale is an asset deal and is aimed at investors and operators who want to take over a large-volume, near-approval project at a very good onshore location.
Interested in more project information?

Key Facts

  • Land
    Germany, Mecklenburg-Western Pomerania
  • Project type
    Onshore wind project law
  • Planned power
    ca. 43,2 MW
  • Wind conditions
    Ø approx. 7.6 m/s at hub height, windy location
  • System configuration
    6 wind turbines, hub height approx. 166-199 m
  • Annual energy yield
    approx. 20.1 GWh per wind turbine
  • Environmental status
    Environmental mapping ongoing, all wind turbines outside relevant taboo radii; Case-by-case assessment of an investment
  • Area status
    Largely secured; Individual wind turbines in clarification (priority area / development)
  • Grid status
    Network request made
  • Project status
    Preliminary decision pursuant to § 9 para. 1a BImSchG applied for (08/2025), approval expected Q1 2027