When it comes to the implementation of wind turbines, we come up with 
nationally and internationally in several important sections on the 
Use:
Road construction
Before the construction of a wind turbine can take place, we meet the 
preparatory construction measures. In an often harsh, impassable environment 
we create the conditions for a 
smooth running of the entire construction traffic.
Foundation construction
We realize foundations with our own formwork sets for 
different types of towers. In doing so, we draw up our own concrete testing laboratory 
with specialist personnel of monitoring classes 2 (ÜK2) and E in accordance with DIN EN 206 
and DIN 1045. Any deep foundation measures that become necessary will be 
controlled by us. With extensive experience of well over 
1,000 projects implemented in this area and extensive 
expertise, we create sophisticated foundation structures.
Tower
In tower construction, we erect concrete towers for turbines of up to 200 meters
 Hub height. Both the implementation by the in-situ concrete and by 
prefabricated construction methods are part of our portfolio. dimensional accuracy is 
the decisive quality criterion, which we use with the highest 
Implement care. In addition, we develop our own solutions in the 
Height access technology.
Dismantling
OEHM has special expertise in the field of dismantling: 
Regulated dismantling of concrete towers, we have a special procedure 
that does not require risky explosives. Thanks 
individual height access and cutting technology, we are able to 
the complete dismantling of wind turbines, including foundations, 
shape. This ensures a particularly safe, efficient and 
environmentally friendly implementation.
In addition, we offer professional disposal 
non-recyclable composites, another field is the 
Concrete recycling. The demolition material is sorted out according to regulations 
and disposed of or recycled properly. In addition,
 we carry out all the necessary earthworks.