wind-turbine.com
Search
wind-turbineMatch
With us you will find the right provider!
Create an inquiry and we will put you in touch with relevant providers.
Ready to Build (RTB)

Wind energy project with 4.2 MW in north-eastern Germany

A fully permitted, ready-to-build onshore wind energy project in a designated priority area is for sale in the asset deal.

  • Installed Power: 4,2 MW
  • Plant configuration: 1x Vestas Onshore-Windenergieanlage
  • Annual yield (P50, net): ca. 10,16 GWh
  • Location: Brandenburg (design area for a priority area for wind energy use)
Approved RTB project
for immediate start of construction
Secured legal
and technical framework
Proven turbine technology
and stable yields
Short development
and construction time

Description of the wind energy project

Approved onshore wind project in northeast Germany - ideal for investors in the established German market

This fully approved wind energy project with a capacity of 4.2 MW is located in a design area for a priority area for wind energy use in Brandenburg. The project has been developed ready for construction and has all the essential permits in accordance with § 4 in conjunction with § 19 BImSchG.

With a hub height of approx. 166 m and a rotor diameter of 136 m, the project relies on proven Vestas technology. The grid connection via medium voltage (20 kV) is secured, and all necessary areas are contractually secured in the long term. The sale will take place as part of an asset deal with availability from February 2026.
Interest? Then please feel free to contact us!

Key Facts

  • Land
    Germany - politically stable, legally secure framework, established onshore wind market
  • Project type
    Onshore wind power
  • Installed capacity
    4,2 MW
  • Wind conditions
    Ø 6.27 m/s - solid yield basis for long-term stable electricity production
  • System configuration
    1 × Vestas (Nabenhöhe ca. 166 m / Rotordurchmesser 136 m)
  • Annual yield (P50, net)
    ca. 10,16 GWh
  • Area status
    All necessary private areas contractually secured in the long term
  • Grid connection
    Medium-voltage connection 20 kV bindingly reserved (approx. 5-6 km distance)
  • Approval Status
    Approval according to § 4 in conjunction with § 19 BImSchG is available in full
  • Sales model
    Asset deal - project takeover possible from February 2026

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com