wind-turbine.com
Existing park with repowering option

Share Deal Wind Farm Portfolio NRW with Approved Repowering

Ongoing wind farm in North Rhine-Westphalia with EEG-remunerated portfolio until 2034, 8 MW grid connection commitment and previously approved repowering option for an Enercon E-175 with 6 MW.

  • Transaction structure: Share Deal
  • Existing park: 5 x Enercon E-53, 4 MW in total
  • Repowering: previously approved: 1 x Enercon E-175 with 6 MW
  • Power Supply: Commitment of 8 MW
  • Region: North Rhine-Westphalia
EEG Cash Flow
by 2034
Approved
6 MW repowering
8 MW
Grid commitment
Share Deal
for operators
& Investors

Description of the wind project

Wind farm portfolio in North Rhine-Westphalia - Portfolio with repowering prospects

An ongoing wind farm in North Rhine-Westphalia is being offered as part of a share deal. The existing wind farm comprises five Enercon E-53s with a total capacity of 4 MW and built in 2013. According to the operator, the turbines are technically in very good condition.

For the asset, there is so far an approved repowering option for an Enercon E-175 with 6 MW and 162 m hub height. The implementation provides for four E-53s to be replaced by one E-175; one E-53 can remain after repowering.

The current portfolio has an EEG remuneration of 9.63 ct/kWh until 2034. A grid connection commitment of 8 MW has been submitted. New usage contracts provide for a future lease of around EUR 74,000 per year.

Based on the current state of information, the preliminary value indication is around EUR 3.2 to 4.0 million Enterprise Value cash- and debt-free. An ambitious market positioning in the range of around EUR 4.2 to 4.5 million can be examined in the structured process.

The reason for the sale is an age-related exit; an economic emergency is not reported. For qualified interested parties, further operating data, project documents and documents on the repowering business case are available in the further process.
Interested in assessment documents and repowering business case?

Key Facts

  • Region
    North Rhine-Westphalia
  • Transaction structure
    Share Deal
  • Existing park
    5 x Enercon E-53, 4 MW in total
  • Year of construction
    2013
  • Existing technology
    73.25 m tubular steel tower, EPK, according to the operator very good condition
  • EEG remuneration
    9.63 ct/kWh by 2034
  • Repowering
    previously approved: 1 x Enercon E-175, 6 MW
  • Hub Height Repowering
    162 m
  • Implementation
    4 E-53s are replaced by 1 E-175; 1 E-53 can remain
  • Mains connection
    Grid connection commitment of 8 MW
  • Areas / Leases
    New usage contracts; future lease approx. EUR 74,000 per year
  • Preliminary value indication
    Enterprise value approx. EUR 3.2-4.0 million; market positioning approx. EUR 4.2-4.5 million

Interested in more information?

Then please feel free to contact me
Bernd WeidmannCEOwind-turbine.com