Initial Cost Estimate for the Potential Decommissioning of 2 ENERCON E-40 Turbines in the Southern Black Forest

Dismantling of wind turbines

Category

300 €

Price

30.09.2026

Date

Reviewed and commented by wind-turbine.com

For a plant operator, we ask for an initial rough cost estimate for the possible dismantling of two wind turbines in the southern Black Forest.

A final decision has not yet been made on dismantling. The initial aim of the inquiry is to obtain a realistic order of magnitude of the possible dismantling costs. A detailed offer is therefore not required at present.

Attachments:

  • 2 × ENERCON E-40

  • Hub height: 65 m

  • Rotor diameter: 44 m

  • Tubular steel tower

  • Location on exposed meadows

Access is via the rural road network and smaller farm roads. The concrete suitability for crane and heavy goods traffic would have to be examined in further specification.

For the initial cost estimate, we ask you to consider the following variants:

Variant 1:
Dismantling of the two wind turbines, including the foundation area, up to approx. 1 m below the ground surface. The underlying foundation body remains in the ground.

Variant 2:
Dismantling of the two wind turbines, including complete removal of the foundations.

The existing underground cables and a transfer station approx. 1 km away are not part of the dismantling.

Situation pictures and other location information can be provided if required.