Category
Category
Price
Date
For a plant operator, we ask for an initial rough cost estimate for the possible dismantling of two wind turbines in the southern Black Forest.
A final decision has not yet been made on dismantling. The initial aim of the inquiry is to obtain a realistic order of magnitude of the possible dismantling costs. A detailed offer is therefore not required at present.
Attachments:
2 × ENERCON E-40
Hub height: 65 m
Rotor diameter: 44 m
Tubular steel tower
Location on exposed meadows
Access is via the rural road network and smaller farm roads. The concrete suitability for crane and heavy goods traffic would have to be examined in further specification.
For the initial cost estimate, we ask you to consider the following variants:
The existing underground cables and a transfer station approx. 1 km away are not part of the dismantling.
Situation pictures and other location information can be provided if required.